English | 简体中文 | 繁體中文 | 한국어 | 日本語
Friday, 3 March 2023, 22:00 HKT/SGT
Share:
    

Source: Doubleview Gold Corp.
Doubleview Provides Update on HAT Project 2021 and 2022 Drill Data

Vancouver, BC, Mar 3, 2023 - (ACN Newswire) - Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) ("Doubleview") is pleased to provide additional information regarding outstanding analytical information from its 2021 four drill-hole program that totalled 2,476 meters. Assay results will be released in the near future. Furthermore, analytical results from Doubleview's 2022 drill program that comprised 8 holes with total length 3,433 metres, are being received from the laboratory and will be released as soon as they have been compiled and verified. To date, Doubleview has drilled 51 holes at the HAT deposit totalling more than 20,750 meters.

The Company's robust quality assurance - quality control ("QA/QC") process, which among other things, tracks the chain of custody of drill samples, after many delays, in consultation with the independent assay lab, determined that some of the 2021 samples were lost. Although the entire transfer route from the property to the lab was re-evaluated and double-checked and to ensure that the samples were not simply mislaid or misdirected, the exact cause of the loss was not identified.

When 2022 property work began, missing core intervals were re-sampled by re-sawing the remaining half-cores. The replacement samples thus were quarter cores. The Company may consider re-drilling the drill holes in question at a future date but it has been determined that is not necessary at this point.

Following this serious failure of sample custody, the Company's QA/QC procedures were thoroughly reviewed and even further strengthened and were in effect during the 2022 drill program.

Quality Assurance & Quality Control

Hat Project drill core handling procedures were developed to ensure the integrity of data. Cores are delivered securely to a central processing facility where, after being photographed, weighed, measured and logged, they are halved by sawing with one half sent for analysis and one-half retained for future reference. Individual sample lengths vary and are based on geologic characteristics as determined by the on-site geologist. The stream of samples sent to the lab includes blank, duplicate and certified reference samples. Samples are bagged individually, weighed and placed in labelled rice bags for transfer to an ISO 17025 and ISO 9001 standards compliant analytical lab. The lab is independent of Doubleview and maintains rigorous internal monitoring procedures to ensure reliability of assay and analytical results.

Samples were analysed for gold by fire assay with atomic absorption finish 48 other elements by four acid digestion with ICP-MS finish.

Doubleview's 2022 drill program comprised of 8 drill holes totalling 3,433 meters. Analytical results are currently arriving from the laboratory and will be released as soon as they have been compiled and verified.

Qualified Persons:

Erik Ostensoe, P. Geo., a consulting geologist and Doubleview's Qualified Person with respect to the Hat Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this news release. He is not independent of Doubleview as he is a shareholder of the company.

About Doubleview Gold Corp

Doubleview Gold Corp., a mineral resource exploration and development company, is based in Vancouver, British Columbia, Canada, and is publicly traded on the TSX-Venture Exchange (TSXV: DBG), (OTCQB: DBLVF), (WKN: A1W038), (FSE: 1D4). Doubleview identifies, acquires and finances precious and base metal exploration projects in North America, particularly in British Columbia. Doubleview increases shareholder value through acquisition and exploration of quality gold, copper and silver properties and the application of advanced state-of-the-art exploration methods. The Company's portfolio of strategic properties provides diversification and mitigates investment risk.

On behalf of the Board of Directors,
Farshad Shirvani, President & Chief Executive Officer

For further information please contact:
Doubleview Gold Corp
Vancouver, BC
Farshad Shirvani, President & CEO
E: corporate@doubleview.ca

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management's current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Doubleview cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many of which are beyond Doubleview's control. Such factors include, among other things: risks and uncertainties relating to Doubleview's limited operating history and the need to comply with environmental and governmental regulations. Accordingly, actual and future events, conditions and results may differ materially from the estimates, beliefs, intentions and expectations expressed or implied in the forward-looking information. Except as required under applicable securities legislation, Doubleview undertakes no obligation to publicly update or revise forward-looking information.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Topic: Press release summary
Source: Doubleview Gold Corp.

Sectors: Metals & Mining, Daily Finance, Daily News, Local Biz
https://www.acnnewswire.com
From the Asia Corporate News Network


Copyright © 2023 ACN Newswire. All rights reserved. A division of Asia Corporate News Network.

 

Doubleview Gold Corp. Related News
Sept 28, 2023 08:00 HKT/SGT
더블뷰, 독자적인 야금학적 테스트 작업을 통해 스칸듐을 2차 인산염 제품으로 회수, 총 스칸듐 회수율은 해트(Hat) 광상에서 90% 이상이라고 보고
2023年9月27日 12時00分 JST
Doubleview、独自の冶金テストワークにより、Hat鉱床からのスカンジウムの総回収率が90%を超え、二次リン酸塩製品へのスカンジウムの回収を実証したことを報告
Sept 27, 2023 09:00 HKT/SGT
Doubleview報告專有冶金測試顯示從Hat礦床回收鈧至二次磷酸鹽產品,總鈧回收率大於90%
Sept 27, 2023 09:00 HKT/SGT
Doubleview报告专有冶金测试显示从Hat矿床中回收钪至二次磷酸盐产品,总钪回收率大于90%
Sept 26, 2023 21:29 HKT/SGT
Doubleview Reports Proprietary Metallurgical Testwork Demonstrates Recovery of Scandium into a Secondary Phosphate Product, with a Total Scandium Recovery Greater than 90% from the Hat Deposit
More news >>
Copyright © 2023 ACN Newswire - Asia Corporate News Network
Home | About us | Services | Partners | Events | Login | Contact us | Cookies Policy | Privacy Policy | Disclaimer | Terms of Use | RSS
US: +1 214 890 4418 | China: +86 181 2376 3721 | Hong Kong: +852 8192 4922 | Singapore: +65 6549 7068 | Tokyo: +81 3 6859 8575